TOP 10 implementation
Fabric covered buildings and metal buildings production
Fabric covered buildings reconstructionsport buildings, storage buildings, hangars
Fabric Buildings and Steel Buildings
also for lease
typ U,A,VS
Fabric buildings made to notice. These buildings are anchored into a standard ground. Leases of fabric buildings with the shortest term of lease 3 months.
top 10
implemented
fabric buildings and steel buildings
Overview of the best fabric buildings and steel buildings implementations.
Overview of the best implementations
1. |
 |
Purpose of structure: Sports grounds
Locality: Prague - Motol
Structure description:A lightweight steel frame with gable roof, covered with special PVC fabric designed for buildings. This structure is conceived as roofing of a cycling oval stadium (velodrome). Width without supports is 45m and length is 75m. This is the largest building in its category made by Czech company in the territory of the Czech Republic. Erection lasted 40 net days. |
2. |
|
Purpose of structure: Warehouse for finished products
Locality: Ledeč nad Sázavou
Structure description: A lightweight truss arch frame covered with special PVC fabric designed for buildings. This is a warehouse with maximum volume utilization in regard to the building size. Width is 25m, length 50m. Anchored into a concrete slab. Erection lasted 10 net days. |
3. |
|
Purpose of structure: Manufacturing hall used as a joiner’s workshop.
Locality: Pilníkov, district Trutnov
Structure description: A steel plate-girder structure covered with sandwich panels. The building was conceived in L-shape so as to fit in the concept solution of the whole premises. Anchoring into concrete footings. Erection lasted 40 net days. |
4. |
|
Purpose of structure: Atypical shed for tyre crushing machinery.
Locality: Hranice na Moravě
Structure description: A lightweight truss arch frame covered with special PVC textile designed for fabric buildings. This solution proves the universality and variability of these structures. The building is 8m wide and 20m long. |
5. |
|
Purpose of structure: Manufacturing and storage hall used for sorting and storing of seedlings and parking of farming machinery and implements.
Locality: Nová Role u Karlových Varů
Structure description: A steel structure of plate girders covered in one third with sandwich panels, otherwise with trapezoid sheet metal. This building is characterized by a combination of insulated and un-insulated part. Both parts are separated by a dividing partition. Erection lasted 35 working days. The structure is 12.5m wide and 27m long. |
6. |
|
Purpose of structure: Storage for chemical industry.
Locality: Prague – Horní Počernice
Structure description: A steel structure with lattice girders covered with trapezoid sheet metal. The construction is furnished with a loading ramp shed. The structure is anchored on concrete foots. The building is 22m wide and 75m long, side height is 9m. Erection lasted 35 working days. |
7. |
|
Purpose of structure: Beverage wholesale warehouse.
Locality: Hory u Jenišova district Karlovy Vary
Structure description: A lightweight truss arch frame covered with special PVC textile designed for fabric buildings. This is a warehouse with maximum volume utilization in regard to the building size. It includes 3 neighbouring structures, width 20m, length 80m. Construction speed - 1 building in 8 days. All buildings are insulated. |
8. |
|
Purpose of structure: Roofing of machinery and equipment for secondary resources processing (paper).
Locality: Šulákovo, Slovak Republic
Structure description: Lightweight truss arch frame covered with special PVC textile designed for fabric buildings. Serves as a storage facility with maximum volume utilization as regards the building size. The building is 30m wide and 50m long, with side height 7m. Erection lasted 15 days. |
9. |
|
Purpose of structure: Manufacturing hall
Locality: Jesenice near Prague
Structure description: A steel structure made of plate girders covered with sandwich panels. From one side the structure has elongated roof serving as a loading area shed. Width 20m, length 40m. Erection lasted 45 days. |
10. |
|
Purpose of structure: Warehouse
Locality: Mohelnice
Structure description: Lightweight truss arch frame covered with special PVC textile designed for fabric buildings. The structure is 15m wide, 35m long. Erection lasted 5 days. |